Preparation for installation

  1. Remove outside air opening from the packaging.
  2. Pull the complete inner part off the wall sleeve.
  3. Pull the complete outer part off the wall sleeve.
  4. Remove the inner sound insulation elements from the wall sleeve.
  5. Determine the installation position.

A minimum distance of 110 mm from the centre of the core drill hole to the wall and ceiling is required.